Stock · NTPC · Power generation
NTPC share price target 2026
Support, resistance, the F&O structure and the BazaarBaazi Crack Score for NTPC Limited, refreshed every end-of-day run. A systematic, data-only read on NTPC Limited: where it trades versus its 50-day and 200-day lines, the live 52-week range, and momentum. Refreshed from real price structure each run.
The verdict
BazaarBaazi reads NTPC as two-way with a Crack Score of 55/100 as of 9 Jun 2026.
BazaarBaaziSource & method
Price target: support and resistanceComputed 9 Jun 2026
Support and resistance for NTPC are read inside the latest show; no spot was printed in the most recent editorial note.
Levels are read inside the latest show. The most recent editorial reference is Systematic Read on 9 Jun 2026.
These are structural reference lines, not a SEBI-registered price target. BazaarBaazi is independent media; the levels frame how the desk reads the NTPC chart, refreshed every end-of-day run.
The Crack Score, and how it is built55 / 100 · Constructive
The Crack Score is a deterministic 0 to 100 conviction number. Here is exactly what moved it for NTPC, so the figure is a transparent signal rather than a vibe.
Base 50, adjusted by the factors above and clamped to 0 to 100. How the Crack Score works.
About NTPC LimitedBusiness profile
What NTPC actually does, and the edge that holds its position.
NTPC is the rare way to own a regulated cash cow that is quietly trying to reinvent itself as a green-power growth story at the same time: it is India's largest power generator by installed capacity, running coal, gas and hydro plants nationwide. It sells that electricity to state distribution companies on long-term power purchase agreements at regulated tariffs set by the Central Electricity Regulatory Commission, which is what makes the base earnings so predictable. The reinvention is its subsidiary NTPC Renewable Energy, chasing a large solar and wind build-out that is meant to carry the next leg of growth.
NTPC's regulated-return model provides visibility: tariffs are set to recover costs plus a regulated return on equity, insulating earnings from fuel-cost swings. Its scale of legacy thermal capacity and the long-term PPA structure make displacement by new entrants slow and capital-intensive.
The F&O viewHorizon · swing
How the futures and options structure on NTPC reads right now.
The futures and options read on NTPC leans to a two-way / range write. Strike-level positioning is read inside the latest show, against the printed spot. Single-stock F&O on NTPC is thinner than the index, so open-interest shifts read with more noise; the desk weights price structure over raw OI. This is a structural reading of positioning, not a derivatives trade recommendation.
Why it movedLatest editorial line
The most recent BazaarBaazi read on what is driving NTPC.
Systematic read: a disclosed, data-only model on real 1-year price structure.
Read in Systematic Read on 9 Jun 2026. Why NTPC moved, the living explainer, tracks every move on one URL.
The 2026 to 2030 pictureStructural read
What genuinely drives NTPC over a multi-year horizon. A structural read, not a price forecast.
Over 2026 to 2030 NTPC's earnings base is stable from existing thermal PPAs, but growth depends on how fast it can commission renewable capacity and whether new thermal plants win bids in a market increasingly sceptical of long-life coal assets. The energy-transition pivot to solar and wind is both an opportunity and a capital-allocation test. The principal risk is cost overruns in renewable construction combined with continued distribution company payment delays. WHAT BAZAARBAAZI THINKS: The regulated thermal base pays you to wait while the green pivot decides whether this re-rates; the floor is genuinely solid, and the risk the Crack Score cannot fully price is the same one buried under every Indian generator, namely chronically stressed state discoms that can turn reported earnings into receivables that take quarters to actually collect.
What to watch:
- Renewable capacity commissioning pace against announced targets
- Plant load factor at thermal stations as a revenue signal
- State DISCOM payment timelines and outstanding receivables
- New project bids won in competitive renewable auctions
- Coal linkage security and imported coal cost
Peers and how to compare4 listed names
The listed names NTPC is most often read against. Compare them on the same Crack Score and levels.
Power Grid Corporation · POWERGRID
Read the POWERGRID verdict and levels
Coal India (fuel supplier) · COALINDIA
Read the COALINDIA verdict and levels
Adani Power (private thermal)
Listed peer in the same space
Tata Power (diversified utility)
Listed peer in the same space
Live valuation readQ4 FY18 earnings · live spot
P/E, P/B, yield and the quality set for NTPC Limited, computed from the latest filed results times the live spot. The price-driven ratios (marked) refresh every session; ROE and margins hold until the next results.
P / E ·
11.9x
Earnings yield ·
8.40%
P / B ·
1.73x
P / S ·
1.88x
EV / EBITDA ·
8.4x
Dividend yield ·
3.13%
Market cap ·
Rs 3.51 lakh cr
Enterprise value ·
Rs 4.62 lakh cr
Stored from NTPC Limited's filed results, as of 2026-06-09 and currency-checked. Open the calculator, move the price and watch every ratio react.
Latest filed resultsQ4 FY26
NTPC Limited's most recent quarter, parsed straight from the official NSE filing. Every figure links back to its primary source.
Result Pulse
93 / 100Revenue
Rs 49,688 crNet profit
Rs 10,615 crEPS (quarter)
Rs 10.81| Growth | YoY | QoQ |
|---|---|---|
| Revenue | -0.3% | +8.4% |
| Net profit | +34.4% | +89.7% |
| Net margin | +21.4% | |
Figures are the Q4 FY26 result for NTPC Limited, parsed straight from the official NSE integrated filing and verified to the paisa. The EPS shown is for the quarter, not a trailing-twelve-month figure, so it is not a P/E input.
What changed6 disclosures
Every recent official filing from NTPC Limited, straight from the exchange feed, with the BazaarBaazi Event Heat on the disclosure flow.
NTPC Limited has filed 6 official disclosures recently. The most recent is a Board meeting dated 23 May 2026.
Event Heat
58 / 100Board Meeting to be held on 23-May-2026 to consider and approve the Yearly Audited Financial results of the Company for the period ended March 2026 and Dividend
To consider and approve Annual Standalone and Consolidated Financial Statements for the year ended 31st March 2026 and Recommendation of final dividend for the year ended 31st March 2026, if any.
Board Meeting to be held on 30-Jan-2026 to consider and approve the Quarterly Unaudited Financial results of the Company for the period ended December 2025 and Dividend
To consider and approve the financial results for the period ended December 31, 2025 and 2nd Interim dividend for the financial year 2025-26.
Event Heat is a dated net read of NTPC Limited's last 90 days of official disclosures, balancing the constructive filings against the ones to watch. It is a signal from what the company has filed, not investment advice. Every line above links to its official exchange filing, and the full market desk is at the disclosures hub.
Key fundamentalsEditorial reference
The anchor data BazaarBaazi references when reading the NTPC chart. Not a substitute for a registered research note.
| Ticker | NTPC |
|---|---|
| Full name | NTPC Limited |
| Sector | Power generation |
| Index class | LARGE CAP |
| ISIN | INE733E01010 |
| Market-cap band | ~3.5 lakh cr |
| Last referenced level | Inside latest show |
| Last session move | Not referenced this cycle |
| Editorial line in | Systematic Read on 9 Jun 2026 |
| Aliases tracked | NTPC |
Reference chartLevels in show
The daily frame the desk reads on NTPC.
FAQ14 reader questions · AEO-eligible
The line on NTPC, distilled and schema-marked for AI Overview, Perplexity, and reader search.
What is the NTPC share price target for 2026?
BazaarBaazi does not publish a SEBI-registered price target on NTPC. The desk reads structural support and resistance inside each show against the printed spot; the most recent editorial line is Systematic Read on 9 Jun 2026.
What is BazaarBaazi's Crack Score for NTPC?
The BazaarBaazi Crack Score for NTPC is 55 out of 100 as of 9 Jun 2026, a constructive reading. It is a computed conviction number from the signed stance, how consistent the recent verdicts have been, the quality of the printed structure, and how fresh the review is. It is a transparency signal, not investment advice.
What is the F&O view on NTPC?
As of 9 Jun 2026, BazaarBaazi reads NTPC positioning as a two-way range write. This is a structural reading of the option chain, not a derivatives recommendation.
What sector is NTPC in and which peers does BazaarBaazi track?
NTPC sits in Power generation (large cap), indicative market cap ~3.5 lakh cr, ISIN INE733E01010. The peers BazaarBaazi reads alongside it are Power Grid Corporation of India Limited, Adani Energy Solutions Limited, Adani Green Energy Limited. A systematic, data-only read on NTPC Limited: where it trades versus its 50-day and 200-day lines, the live 52-week range, and momentum. Refreshed from real price structure each run.
How often is the NTPC view updated?
This page is one evergreen URL refreshed in place. The Crack Score and levels re-compute on every BazaarBaazi end-of-day run, and the dated stamp shows the last refresh. The latest signed verdict on NTPC is mixed, published in Systematic Read on 9 Jun 2026.
Is NTPC a good long-term stock?
What drives this name is the regulated return on a steadily growing asset base, with renewable commissioning as the re-rating kicker, and the risk the Crack Score cannot fully capture is discom payment health, because a generator only compounds if the buyer actually pays on time. The Crack Score on this page gives the current read.
What is the NTPC share price target for 2030?
The 2030 outcome rides on how much of NTPC's capacity is green by then and whether discoms are paying cleanly, so a single price number tells you less than those two trends do. BazaarBaazi frames the case by tracking renewable commissioning pace, DISCOM payment health and regulated equity returns; the Crack Score reflects where the risk-reward stands today.
Why is NTPC share price falling?
The usual culprits are discom payment stress flaring up, a broad PSU de-rating, or the market losing patience with the pace of renewable additions. A drop in plant load factor at thermal stations can also signal a weaker near-term earnings picture.
What was NTPC Limited's Q4 FY26 net profit?
NTPC Limited reported a net profit of Rs 10,615 cr for Q4 FY26 (the quarter ended 31 March 2026). That is +34.4% year on year. The figure is from the company's official NSE filing.
What was NTPC Limited's Q4 FY26 revenue?
NTPC Limited reported revenue of Rs 49,688 cr for Q4 FY26. That is -0.3% year on year. The figure is from the company's official NSE filing.
How does BazaarBaazi rate NTPC Limited's Q4 FY26 result?
BazaarBaazi gives NTPC Limited's Q4 FY26 result a Result Pulse of 93 out of 100, with a verdict of Profit acceleration. The Result Pulse is a BazaarBaazi editorial score for the quality of the filed result, not investment advice.
What has NTPC Ltd announced recently?
NTPC Ltd's two most material recent disclosures are a board meeting dated 23 May 2026, "Board Meeting to be held on 23-May-2026 to consider and…", and an earnings dated 31 Mar 2026. Both link to the company's own official filing on the BazaarBaazi stock page.
Has NTPC Ltd declared a dividend recently?
Yes. NTPC Ltd filed a dividend disclosure on 06 Feb 2026, filed as "Interim Dividend - Rs 2.75 Per Share". Any amount shown is the exchange's own record, linked from the BazaarBaazi stock page. A dividend is a declared payout, not a forecast of future returns.
What did NTPC Ltd's latest board meeting cover?
NTPC Ltd's most recent board-meeting disclosure on record dated 23 May 2026 reads "Board Meeting to be held on 23-May-2026 to consider and approve the…". That is the agenda as filed with the exchange, linked from the BazaarBaazi stock page, and BazaarBaazi adds no claim of its own to it.
Related stock views
The names BazaarBaazi reads alongside NTPC, each a living view refreshed every end-of-day run.
Hub
All stock views
The full BazaarBaazi coverage universe, scored and dated.
Power transmission
POWERGRID
Power Grid Corporation of India Limited
Power transmission
ADANIENSOL
Adani Energy Solutions Limited
Renewable power
ADANIGREEN
Adani Green Energy Limited
Thermal power
ADANIPOWER
Adani Power Limited
Power generation and distribution
TATAPOWER
Tata Power Company Limited